SE Inner Loop – Georgetown Bonds (2024)

This 2.9-mile project consists of widening SE Inner Loop to a four-lane, divided, minor arterial from Hwy. 29 to Sam Houston Avenue and to a five-lane, undivided, major arterial from Sam Houston Avenue to FM 1460. The project also includes a shared-use path for pedestrians and bicycles on one side.

Design engineers have completed 30-percent design plans for SE Inner Loop. Schematic designs include vehicle lane configurations and other features such as sidewalks, multi-use paths, and drainageways.

Project documents:

SE Inner Loop – Exhibit Board
SE Inner Loop – Fact Sheet
SE Inner Loop – schematic design 30%
SE Inner Loop – schematic design 30% p2

SE Inner Loop – Georgetown Bonds (2024)
Top Articles
Latest Posts
Article information

Author: Merrill Bechtelar CPA

Last Updated:

Views: 6060

Rating: 5 / 5 (70 voted)

Reviews: 93% of readers found this page helpful

Author information

Name: Merrill Bechtelar CPA

Birthday: 1996-05-19

Address: Apt. 114 873 White Lodge, Libbyfurt, CA 93006

Phone: +5983010455207

Job: Legacy Representative

Hobby: Blacksmithing, Urban exploration, Sudoku, Slacklining, Creative writing, Community, Letterboxing

Introduction: My name is Merrill Bechtelar CPA, I am a clean, agreeable, glorious, magnificent, witty, enchanting, comfortable person who loves writing and wants to share my knowledge and understanding with you.